Architectural Design Coordination Services

Top Flight Technology bridges architecture and engineering — producing clash-free, approval-ready drawing packages your contractor can actually build from, on time and within budget.

Getting the design right before a single foundation is dug saves enormous amounts of time, money and frustration on site. Top Flight Technology's design coordination service ensures your architectural, structural and MEP drawings all work together — eliminating costly clashes, securing planning approvals efficiently and producing a complete construction drawing package that your contractor can confidently build from without daily queries or guesswork.

Clash-Free Drawing Package

Architectural, structural and MEP drawings are cross-checked and coordinated to eliminate conflicts before they become expensive on-site problems.

Planning Approval Submissions

We prepare compliant drawings and manage submissions to LASPPPA, FCTA and other state planning authorities — minimising rejection risk and delays.

Build-Ready Documentation

Your contractor receives a complete, coordinated set of drawings, specifications, material schedules and details — everything needed to price and build accurately.

Our Design Coordination Process

1
Client Brief & Feasibility Study

We capture your project objectives, site constraints, budget parameters and regulatory requirements to produce a coherent design brief before any drawing work begins.

2
Concept Design & Client Approval

Architectural concept options are developed, visualised and presented to you for selection before progressing to detailed design — ensuring the project reflects your vision from the start.

3
Multidisciplinary Coordination

Architectural, structural, electrical, plumbing and drainage drawings are overlaid and cross-checked to identify and resolve every clash and interface conflict — on screen, not on site.

4
Regulatory Submission & Approval

We prepare complete, compliant drawing packages and manage submissions to the relevant planning authority — LASPPPA, FCDA or state-level offices — following up until approval is secured.

5
Construction Drawing Package Issue

A full construction drawing set — including floor plans, elevations, sections, structural details, MEP drawings, material schedules and specifications — is issued to the contractor.

6
Design Support During Construction

We respond to contractor Requests for Information (RFIs) promptly and issue revised drawings when required, keeping the build on programme without costly delays waiting for design clarifications.

Methods & Materials
AutoCAD 2D Architecture & Structure Revit BIM Modelling SketchUp 3D Visualisation LASPPPA & FCTA Submissions Nigerian Building Code Compliance Navisworks Clash Detection Specification Writing Material & Finishing Schedules
Why Choose Top Flight?
  • 12+ years of proven experience
  • 87+ completed projects across Nigeria
  • Dedicated resident engineers on every site
  • Detailed documentation & weekly reporting
  • Phased payment options available
  • Post-completion support & warranty
Talk to an Expert

Got a project in mind? Our team is ready to discuss your requirements and provide a free initial consultation — no obligation.

Get a Free Consultation Chat on WhatsApp

Frequently Asked Questions

Answers to the questions our clients ask most about Design Coordination.

For larger or more complex projects, we typically work with your chosen architect as the lead designer, coordinating their architectural output with the structural and MEP engineering disciplines. For smaller residential projects — bungalows, duplexes, small commercial buildings — we can manage architectural and structural design in-house, giving you a single point of accountability.

LASPPPA approvals in Lagos typically take 3–6 months for standard residential buildings when the submission is complete and correct on first submission. FCTA in Abuja typically runs 2–4 months. We prepare thorough, compliant packages specifically to minimise the risk of rejection and resubmission — the most common cause of delays.

Design changes during construction are normal and manageable when handled correctly. We manage all changes through the formal RFI (Request for Information) and drawing revision process — issuing updated drawings to the contractor with clear revision clouds and notes. This keeps everyone working from the same current information and maintains a clear audit trail.

Yes. We offer design audits for clients who have received drawings from another architect or engineer and want an independent review. We check for code compliance, structural adequacy, coordination clashes and buildability issues — giving you a clear report of what is sound and what needs to be addressed before construction begins.

Let's bring your design coordination project to life.

Contact us today for a free consultation. We'll assess your requirements and deliver a detailed proposal within 48 hours.